Drilling Commences at Pilot Project as
New Gold Mineralisation Trend Emerges
Highlights
• Maiden drilling program has commenced at the Pilot Project following completion of drill pad
preparation and hole surveying.
• 4,800m diamond drilling program to test up to 700m downhole length and target the extensive
Pilot Project gold stockwork system, which outcrops at surface with grades ranging from 0.1 g/t Au to
56.6 g/t Au based on Company sampling.
• Reconnaissance mapping and sampling continues to define additional gold mineralisation, with
recent assay results from an area 3km east of the Pilot Project returning grades of up to 12.6 g/t Au,
associated with strongly altered acid and mafic porphyry stockwork.
Right Resources Limited (ASX:RRE) (Right Resources or the Company) is pleased to announce the
commencement of its maiden 4,800m diamond drilling program at the Pilot Project in Tumbarumba,
New South Wales. The commencement of the program coincides with assay results returning grades up
12.6 g/t Au from an area located 3km east of the Pilot Project on tenement EL9712.
Right Resources Managing Director, Graham Howard, commented: “The commencement of drilling at
the Pilot Project marks an exciting milestone for the Company, delivering on our timeline and commitment to
shareholders. The coincident assay results from EL9712 further demonstrates our ability to rapidly identify
large mineralisation trends through an integrated geology and geophysics targeting approach. It remains
remarkable that no modern drilling has ever been undertaken across our Tumbarumba tenements–
particularly given that gold stockwork mineralisation has been confirmed to outcrop at surface.”
Figure 1: Eagle Drilling NQ Pty Ltd commence drilling at the Pilot Project
2 www.rightresources.com.au
Reconnaissance Mapping and Sampling
Right Resources is pleased to report on the discovery of a new gold system on tenement EL9712,
approximately 3km east of the Pilot Project.
The Company’s geology and geophysics team has been actively compiling a series of geophysical
anomalies using both State and Company airborne datasets, including magnetic, radiometric,
magnetotelluric and light detection and ranging (LiDAR) surveys. This work is enabling prioritisation of
regional exploration mapping and sampling to target potential new gold zones beyond the Company’s
flagship Pilot Project.
In October 2025, reconnaissance mapping was conducted by Dr Jim Yaxley (Grasstree Resources) and
Paul Mutton (Touchstone Geophysics) to validate features identified through LiDAR and regional magnetic
surveys. Rock chip sampling was undertaken across EL9712, EL9449 and EL9028, with 25 samples
collected for assay. Of these, three returned significant anomalous gold grades (Figure 2, Figure 3 and
Appendix 1 and Appendix 2), including:
• RTRK00005 at 12.6 g/t Au, EL9712
• RTRK00018 at 10.3 g/t Au, Pilot Project, EL9449; and
• RTRK00003 at 0.35 g/t Au, Peony Prospect, EL9449.
Field mapping in EL9712 confirmed multiple rhyolites, porphyritic mafic and acid intrusive units not
previously recorded in the NSW Geological Survey database, with strong hydrothermal alteration and quartz-
dominated stockwork. Mineralisation also crops out at surface over a 2km north–south zone. Notably, no
modern drilling has been conducted in this area.
In addition to rock chip sampling, 24 samples were collected for fluid inclusion and petrology studies at the
University of Tasmania (UTAS) as part of ongoing work between Right Resources and UTAS. Results are
pending and will provide insights into mineralisation style and genesis of the newly identified locations,
guiding future exploration.
The Company will conduct follow‑up mapping and systematic rock and soil sampling along the structures
hosting the high‑grade and anomalous samples within EL9712 to better define the geological architecture
and extent of the anomalies.
Figure 2: Plan view of samples containing significant gold grades;
RTRK00005 (12.6 g/t Au), RTRK00018 (10.3 g/t Au) and RTRK00003 (0.35 g/t Au)
3 www.rightresources.com.au
Figure 3: Porphyry sample RTRK00005 with significant
assay result of 12.6 g/t Au
Figure 4: Dr Jim Yaxley undertaking detailed
field mapping and sampling
For further information please refer to the following ASX announcements:
• Early Works Completed and Drill Mobilisation Underway at Pilot Project (Au), 17 November 2025
ENDS
This announcement has been approved for release by the Board of Right Resources Limited.
4 www.rightresources.com.au
Further Information
Graham Howard
Managing Director
E: info@rightresources.com.au
Jessamyn Lyons
Company Secretary
E: jessamyn.lyons@rightresources.com.au
Media
Stephanie Richardson
Sodali & Co
E: stephanie.richardson@sodali.com
About Right Resources
Right Resources Limited is a New South Wales–based mineral exploration company focused on advancing a
portfolio of gold and copper assets across 2,089 km² of tenements in the Tumbarumba and New England
regions, both located within historically significant goldfields.
The Company’s portfolio boasts eight 100% owned exploration licences in New South Wales (NSW), which
are considered by the Company as highly prospective for copper and gold. The primary focus of exploration
will be on the six licenses held in the Tumbarumba Region, which lies within the Lachlan Fold Belt and
adjacent to a prolific mineral province near the Gilmore Fault Zone (GFZ), with over 90km of tenement strike
length along this key structural feature associated with gold mineralisation. The host geology in the project
areas includes near-surface high grade gold epithermal, porphyry, and stockwork systems.
The Company’s flagship asset is the Pilot Project, a prospective high-grade gold target in the Tumbarumba
Region. The area includes significant historic hard rock and alluvial workings that are largely undocumented
in the NSW mineral occurrence database and is completely untested by modern drilling.
Follow Us
Forward Looking Statements
This document contains certain forward-looking statements concerning Right Resources Limited. Forward-
looking statements are not statements of historical fact and actual events and results may differ materially
from those described in the forward-looking statements as a result of a variety of risks, uncertainties and
other factors. Forward-looking statements are inherently subject to business, economic, competitive, political
and social uncertainties and contingencies. Many factors could cause the Company’s actual results to differ
materially from those expressed or implied in any forward-looking information provided by the Company, or
on behalf of, the Company. Such factors include, among other things, risks relating to additional funding
requirements, metal prices, exploration, development and operating risks, competition, production risks,
regulatory restrictions, including environmental regulation and liability and potential title disputes.
Forward-looking statements in this document are based on the Company’s beliefs, opinions and estimates of
the Company as of the dates the forward-looking statements are made, and no obligation is assumed to
update forward-looking statements if these beliefs, opinions and estimates should change or to reflect other
future developments. These forward-looking statements should be read in conjunction with, and are qualified
5 www.rightresources.com.au
by reference to the Company’s Prospectus dated 19 September 2025 and released on the ASX on 27
October 2025, including in particular sections 3 and 4 of the Prospectus. The Company cannot and does not
give any assurance that the results, performance or achievements expressed or implied by the forward-
looking statements contained in this document or the Prospectus will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
Competent Person Statement
Jim Yaxley
The information in this announcement that relates to Exploration Results is based on and fairly represents
information and supporting documentation compiled by Dr Jim Yaxley, who is a consultant at Grasstree
Resources Pty Ltd. Dr Yaxley is a Competent Person who is a Member of the Australian Institute of Geology
(AIG).
Dr Yaxley has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC, 2012).
Dr Jim Yaxley is a consultant at Grasstree Resources Pty Ltd and has no material interests in the Company.
Dr Yaxley consents to the inclusion in this report of the matters based on his/her information in the form and
context in which it appears.
6 www.rightresources.com.au
Appendix 1 - JORC Table 1, Sections 1 - 2
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling techniques • Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant
disclosure of detailed information.
No drilling has been completed by the
Company across EL9449, EL9712 and
EL9028.
Samples taken be the Company across the
Tumbarumba Region include:
• 25 surface rock samples of outcrop,
were geochemically analysed.
• 24 Utas CODES Samples.
Rock Samples:
• Analysis was completed by and
Bureau Veritas Minerals (BV),
Adelaide, SA.
• Samples were dried, crushed and
pulverised to produce a 50g charge
for fire assay for gold analysis at
Intertek and ALS and a 40g charge
at BV.
• Multielement analysis was
completed using Triple Quad, Four
Acid Super Trace and Four Acid
Digest methodologies.
• 3 surface rock samples returned a
grade greater than 0.35 g/t gold (Au),
reporting a grade range of 0.35 g/t to
12.6 g/t Au with an average gold
grade of 7.75 g/t Au and a median of
10.3 g/t Au.
Drilling Techniques • Drill type (eg. core, reverse circulation,
open hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc)
No drilling has been completed across the
project area.
Drill sample recovery • Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
N/A.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
All rock samples were geologically logged.
Geological logging per sample is qualitative in
nature.
The rock samples reflect a surface point
sample and do not represent a total length
across the area.
Photos of the samples were taken.
7 www.rightresources.com.au
• The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Whole sample processing of the 25 rock
samples was completed at the laboratory.
No splitting of the samples occurred due to
sample weight <3kg.
Samples were dried, crushed and pulverised
with 85% passing 75 microns
Representative samples of outcrop were taken.
The rock samples taken by the Company
indicate the potential grade variability within the
project area.
No field duplicates were taken.
Quality of assay data
and laboratory tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of accuracy
(ie. lack of bias) and precision have been
established.
For all Company Rock Samples:
• The Company uses certified
reference material (CRM) at a
targeted frequency of 1 every 20
samples.
• No blank material has been used.
• No external laboratory checks have
occurred.
• CRM performance falls within
acceptable limits of 2 Standard
Deviations.
Verification of sampling
and assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
No field duplicates have been taken by the
Company.
No adjustments have been made to the assay
data received by the laboratory.
Location of data points • Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
The horizontal datum used is GDA 94 and
projection is MGA zone 55. The vertical datum
is AHD71.
Surface topography has been generated using
high resolution LiDAR survey completed by the
Company in October 2023.
The surface topography has been used to
improve elevations of the sample data.
Hand held GPS unit has been used to
determine location with an estimated accuracy
of +/- 5m.
8 www.rightresources.com.au
Data spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been
applied.
Limited sampling at surface has occurred
therefore the data spacing is clustered and not
evenly distributed across the surface.
This program was limited to roads and spoils
from historical mining areas.
No drilling has occurred at the project.
The distribution of sampling is limited to the
surface and is not used for Mineral Resource
and Ore Reserve estimations.
No sample compositing has been applied.
Rock samples reflect point sampling at surface.
Orientation of data in
relation to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Samples reflect sparse regional
reconnaissance along roads and spot historical
mining waste samples and are not part of
systematic sampling program.
Sample security • The measures taken to ensure sample
security.
The Company maintains a chain of custody of
all samples from collection through to
laboratory submission.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
No audits or reviews have occurred.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The tenements, EL9712, EL9449 and 1 sample
from EL9028, covering the East Maragle/Pilot
Project Area and Laurel Hill Project Area, and
Gilmore Tenement is 100% owned by Right
Resources Ltd in New South Wales, Australia.
The Pilot Project Area lies dominantly in the
Maragle State Forest operated by NSW forestry
with a small occurrence of freehold land. Samples
from the EL9712 (Gilmore) were within
approximately 3km east of the Pilot Project.
Historical alluvial mining has been mined in the
creeks through the Project Areas.
Exploration done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
Historic mining work occurred between 1855 and
1954 across the Tumbarumba Gold Fields.
The Company has obtained hardcopy reports and
maps in relation to this information as part of its
historical review in preparation for their current
work program.
The historic data comprises mine production
records from the NSW Mine Registrar.
Several companies have undertaken periodic and
localised exploration across the Company’s
Tumbarumba Tenements between 1968 and
2015, primarily targeting gold mineralisation.
Geology • Deposit type, geological setting and style
of mineralisation.
The broader mineralisation system is interpreted
to be from a combination of Orogenic and
porphyry systems.
9 www.rightresources.com.au
Drill hole Information • A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
No drilling has occurred across the East Maragle
and Pilot Project Areas, or the east side of
EL9712 (Gilmore).
Data aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No data aggregation or grade cuts have occurred.
Relationship between
mineralisation widths and
intercept lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg. ‘down
hole length, true width not known’).
The nature of the potential mineralisation is
striking 006 degrees and dipping -82 degrees
towards the west.
It has been interpreted that internal north-east
trending (40 degrees) high-grade zones occur
within the mineralisation corridor.
No drilling has occurred.
Surface mapping and rock samples reflected
clustered data which has been utilised to
determine potential geometry and width of
mineralisation.
Diagrams • Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
For a plan image of the sample distribution across
the project area refer to Figure 2.
10 www.rightresources.com.au
Balanced reporting • Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
All data presented in this announcement are
based on Company Sample data within the
Tumbarumba Tenement Areas.
Reporting of both low and high grades have been
included.
Refer to Appendix 2 for reported results.
Other substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
The Company completed a high-resolution LiDAR
survey in October 2023, followed by surface
petrology sampling in 2024 and 2025.
In 2025, Magnetotelluric (MT) geophysical
surveys and observations were conducted across
the Pilot Project area.
Petrology Reports provide by Microanalysis
Australia Pty Ltd include:
• 24_1939 Petrography and XRD report
FINAL.pdf
• 25_0058 Petrography and XRD report -
compressed.pdf
Further work • The nature and scale of planned further
work (eg. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
The Company will conduct follow‑up mapping and
systematic rock and soil sampling along the
structures hosting the high‑grade and anomalous
samples within EL9712 to better define the
geological architecture and extent of the
anomalies.
11 www.rightresources.com.au
Appendix 2 - Reporting Results
Table 1 Reported Results (Coordinate system GDA94/MGA55)
SAMPLE ID LOCATION SAMPLE TYPE EASTING NORTHING Au_ppm Cu_ppm
RTRK00001 EL9712 ROCK 621301 6035200 0.001 228
RTRK00002 EL9712 ROCK 620723 6037234 0.001 168
RTRK00003 EL9449 ROCK 617279 6035690 0.354 82
RTRK00004 EL9712 ROCK 620863 6037309 0.003 38
RTRK00005 EL9712 ROCK 620901 6034541 12.6 122
RTRK00006 EL9712 ROCK 620603 6036767 0.02 34
RTRK00007 EL9449 ROCK 617462 6033249 0.001 98
RTRK00008 EL9449 ROCK 617772 6033300 0.001 36
RTRK00009 EL9712 ROCK 621305 6035381 0.001 38
RTRK00010 EL9449 ROCK 617750 6033929 0.021 32
RTRK00011 EL9712 ROCK 620729 6037255 0.001 42
RTRK00012 EL9712 ROCK 620667 6036593 0.001 64
RTRK00013 EL9712 ROCK 621018 6034610 0.001 30
RTRK00014 EL9712 ROCK 620900 6033951 0.001 40
RTRK00015 EL9712 ROCK 620726 6037031 0.001 52
RTRK00016 EL9712 ROCK 621335 6035355 0.001 48
RTRK00017 EL9712 ROCK 621073 6034705 0.001 42
RTRK00018 EL9449 ROCK 617444 6033597 10.3 34
RTRK00019 EL9449 ROCK 617774 6033289 0.025 22
RTRK00020 EL9449 ROCK 617938 6033772 0.008 <2
RTRK00021 EL9449 ROCK 617389 6033848 0.026 16
RTRK00022 EL9449 ROCK 617656 6033084 0.001 8
RTRK00023 EL9712 ROCK 621344 6035405 0.001 <2
RTRK00024 EL9712 ROCK 620767 6037373 0.001 28
RTRK00025 EL9028 ROCK 601697 6058196 0.026 50
Share your feedback
Discover