Pilot Project Drilling Update
Released
Released
Announcement PDF
Right Resources Limited
ABN 81 649 632 744 www.rightresources.com.au
41-47 Colin Street
West Perth WA 6005
ASX Announcement
+61 8 6245 2050
ASX:RRE
11 December 2025
Pilot Project Drilling Update
Highlights
• Drilling is progressing at the Pilot Project, with the first hole ever drilled at the project now at 459.4m
depth and continuing.
• Multiple styles of mineralisation have been intersected from 2m downhole to current hole depth.
• Approval received to extend drill holes to a maximum depth of 700m (previously 600m), enabling
broader testing of the mineralised system.
• Assay results have not yet been received with results expected in Q1 2026.
Right Resources Limited (ASX: RRE) (Right Resources or the Company) is pleased to report strong
progress on its maiden drilling program at the Pilot Project, located in the Tumbarumba region of NSW within
the Lachlan Fold Belt, and adjacent to a prolific mineral province near the Gilmore Fault Zone.
Drilling has advanced smoothly and safely, with a total of 459.4m completed to date. The diamond drill hole
is oriented east and perpendicular to the strike of the Pilot mineralisation.
The maiden hole has intersected various mineralisation sequences from 2m down hole (DH) to current depth
of 459.4m. Key observations include (Figure 1):
• 2m - 27m DH: hornfels sandstone (arenite) with numerous quartz veins and two underground
workings.
• 27m - 240m DH: variable intensity stockwork and sericite dominated alteration zone within a
granodiorite intrusive unit. Veins (1-10cm thick) comprise sulphide (pyrite), quartz and carbonate
minerals, ranging from multiple veins per meter to one vein every five meters.
• 240m DH onwards: The most intense sulphide mineralisation and alteration zone, featuring:
o Porphyritic mafic units with fine disseminated sulphides.
o Intensely altered lode-style zones up to 10m wide.
o Moderately to strongly altered granodiorite with stockwork veins.
o Felsic porphyry units with disseminated pyrite and quartz-dominated veins.
The hole is currently in a strongly altered host sequence with visible sulphide mineralisation. Based on visual
observations only, the first drill hole will be extended to a minimum depth of 550m, and if mineralisation
persists, drilled to a maximum of 700m DH depth.
Note: The Company has not received assay results from the maidan drilling program at Pilot. Assay results
are expected in Q1 2026. Visual estimates of mineral abundance should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
Right Resources Managing Director, Graham Howard, commented: “We’re very pleased with the
progress of drilling at the Pilot Project. Early observations from the maiden hole are highly encouraging and
align with our geological model.
“The approval to extend the hole depth gives us an excellent opportunity to further assess the mineralisation
potential. We look forward to sharing assay results in Q1 2026.”
2 www.rightresources.com.au
Figure 1: Photos of core showing significant alteration, veins, and mineralisation (sulphides)
Next Steps
• Complete the current drill hole by mid-December and commence additional drilling in January 2026
• Continue detailed geological logging and sampling for laboratory analysis.
• Report assay results in Q1 2026.
For further information please refer to the following ASX announcements:
• Major Expansion of Gold Mineralisation at Pilot Project, released on 27 November 2025
ENDS
This announcement has been approved for release by the Board of Right Resources Limited.
3 www.rightresources.com.au
Further Information
Graham Howard
Managing Director
E: info@rightresources.com.au
Jessamyn Lyons
Company Secretary
E: jessamyn.lyons@rightresources.com.au
Media
Stephanie Richardson
Sodali & Co
E: stephanie.richardson@sodali.com
Follow Us
About Right Resources
Right Resources Limited is a New South Wales–based mineral exploration company focused on advancing a
portfolio of gold and copper assets across 2,089 km² of tenements in the Tumbarumba and New England
regions, both located within historically significant goldfields.
The Company’s portfolio boasts eight 100% owned exploration licences in New South Wales (NSW), which
are considered by the Company as highly prospective for copper and gold. The primary focus of exploration
will be on the six licenses held in the Tumbarumba Region, which lies within the Lachlan Fold Belt and
adjacent to a prolific mineral province near the Gilmore Fault Zone (GFZ), with over 90km of tenement strike
length along this key structural feature associated with gold mineralisation. The host geology in the project
areas includes near-surface high grade gold epithermal, porphyry, and stockwork systems.
The Company’s flagship asset is the Pilot Project, a prospective high-grade gold target in the Tumbarumba
Region. The area includes significant historic hard rock and alluvial workings that are largely undocumented
in the NSW mineral occurrence database and is completely untested by modern drilling.
Forward Statements
This announcement may contain forward-looking statements or information, including forecasts, projections,
opinions and conclusions. These statements are not guarantees of future performance or statements of fact.
Actual events and results may differ materially due to a variety of risks, uncertainties and other factors,
including, among other things, funding requirements, metal prices, exploration and development risks,
operational challenges, competition, production risks, regulatory restrictions, including environmental
regulation and liability, potential title disputes and various business, economic, political and social
uncertainties and contingencies. Although Right Resources believes there is a reasonable basis for any
forward-looking statements, such statements involve significant risks and uncertainties.
4 www.rightresources.com.au
Competent Person Statements
Jim Yaxley
The information in this announcement that relates to Exploration Results is based on and fairly represents
information and supporting documentation compiled by Dr Jim Yaxley, who is a consultant at Grasstree
Resources Pty Ltd. Dr Yaxley is a Competent Person who is a Member of the Australian Institute of Geology
(AIG).
Dr Yaxley has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC, 2012).
Dr Yaxley consents to the inclusion in this announcement of the matters based on his information in the form
and context in which it appears.
Previously Reported Exploration Results
The information in this announcement that relates to the Company’s Exploration Results has been extracted
from the Company’s previous ASX announcements dated 27 November 2025. The Company confirms that it
is unaware of any new information or data that materially affects the information included in those
announcements. To the extent disclosed above, the Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcements. All previously released market announcements referred to within this announcement can be
found on the Company’s website at rightresources.com.au.
5 www.rightresources.com.au
Appendix 1 - JORC Table 1, Sections 1 - 2
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling techniques • Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• One Diamond Drill (DD) (hole ID:
RRPT0001) has been completed by the
Right Resources Limited (“Right
Resources”, “RR”, or “the Company”) at
the Pilot Project Area in EL9449.
• Diamond drilling was undertaken to
obtain high-quality core samples
suitable for geological and geotechnical
logging.
• Core was logged by a qualified
geologist, with intervals marked and cut
for half-core sampling to maintain
representativity.
• Sample intervals typically ranged from
0.2 m to 1.0 m, adjusted based on
lithology and veining. Certain intervals
sampled a minimum of 0.15 m.
• Core was orientated, meter marked, and
core loss recorded.
• Magnetic susceptibility readings were
taken across all intervals using
calibrated instruments, verified against
certified standards.
• These techniques are considered
appropriate for testing mineralisation
controls.
Drilling techniques • Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• DD drilling was undertaken with HQ
(96mm outer diameter) to 50.4mdh and
then NQ2 with a 75.7mm drill bit (outer
diameter).
• Chrome barrel was used to limit hole
deviation, though as yet this has not
been needed
• All core, was inspected by a company
geologist, has been orientated.
• A company representative has either
checked driller orientation marks or
undertaken full length orientation mark
up to validate orientation markings,
suitable for structural modelling.
Drill sample recovery • Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Core loss was recorded after each run
and core block inserted.
• Meter marking was undertaken from the
start of the whole which provides
validation against the core block interval
depths.
• A final rod count after the hole is drill
provides a validation check on total
meters drilled.
• Laboratory measured weight of each
sample
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
• Geological logs have been completed
using a multi pass system capturing
lithology, alteration, mineralogy, veining,
structure and geotechnical RQD and
hardness.
6 www.rightresources.com.au
Criteria JORC Code explanation Commentary
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• Logging is completed at a level suitable
to support future resource estimation.
• Core is photographed both as wet and
dry.
• The total hole has been logged.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• Intervals selected for sampling is half
cut using a diamond saw.
• To minimise bias in sample selection,
the orientation line on the core is
positioned slightly off-center in the core
trays. This ensures that the core is
consistently cut in the same position
while preserving the orientation mark.
The half opposite the orientation line is
selected for sampling. A cut line is
placed to differentiate the orientation
line as an indication for cutting.
• No field duplicates have been taken
Quality of assay data
and laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
• Samples were submitted to Bureau
Veritas (BV) in SA for 50g Fire Assay
FA001, FS001, and multi-element ICP
analysis capturing 54 elements
(MA102).
• Internal laboratory QAQC protocols
include routine insertion of blanks,
duplicates, and certified reference
material (CRMs).
• Company QAQC procedures:
o CRMs inserted at a frequency
of 1 in 20 samples (5%),
covering both gold (Au) and
milt-element suites.
o Blanks inserted at a frequency
of 1 in 20 samples (5%) to
monitor contamination.
o No field duplicates were
collected for this initial hole,
however laboratory pulp
duplicates are routinely
analysed.
• Instrument calibration:
o Magnetic susceptibility
readings were taken using a
calibrated instrument with
periodic checks against
known standards.
o Accuracy and precision
o QAQC results will be
reviewed upon receipt of
assays (assays pending at
time of announcement), any
7 www.rightresources.com.au
Criteria JORC Code explanation Commentary
failures will trigger re-assay
protocols.
o No external laboratory checks
have been completed at this
stage of the program, these
will be considered for future
programs.
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• No twinned holes have been completed.
• Drill logs have been recorded in
electronic format.
• All data is uploaded, validated and
stored in the Company’s Micromine
Geobank Database.
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Location of drill holes were set out by an
independent surveyor from Rivland
Surveyors.
• Down hole survey was completed during
drilling using a Giro Single Shot at 30m
increments.
• Final down hole survey was completed
using Giro Single Shot
• Drill collar was validated against the
Company’s LiDAR survey completed in
September 2023.
• All location data are recorded in MGA
94 ZONE 55.
Data spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• No drill spacing has been established,
with this hole RRPT0001 representing
the first hole drilled into the Pilot Project.
• The current spacing is insufficient to
establish a degree of geological and
grade continuity appropriate for a
Mineral Resource estimation.
• No sample compositing has been
completed.
Orientation of data in
relation to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drilling direction is considered to be an
effective orientation to test the steep
mineralisation trending north-south. Drill
holes are orientated west to east, which
is approximately perpendicular to the
historic mineralisation trend (north-
south) as recorded in historic mining
records.
• Limited knowledge on key mineralised
structures exists to determine if drill
orientations introduce a sampling bias.
Sample security • The measures taken to ensure sample
security.
• After cutting and bagging, each sample
was placed in a tamper-evident, labelled
plastic bag with a unique sample ID.
• Samples were grouped into polywoven
bags, sealed with cable ties, and
documented on a sample dispatch
sheet.
• The dispatch sheet includes:
8 www.rightresources.com.au
Criteria JORC Code explanation Commentary
o Hole ID, interval, sample ID,
and number of bags.
o Signature of the geologist
preparing the samples.
o Samples were stored in a
secure, locked facility on site
until transport.
• Transport procedure:
o A Right Resources
representative delivered
sealed sample bags to the
nominated third-party courier
depot.
o Courier provided a
consignment note, which was
cross-checked against the
dispatch sheet.
• Laboratory confirmation:
o Bureau Veritas confirmed
receipt of samples via
electronic chain-of-custody
acknowledgment, listing all
sample IDs.
o All chain-of-custody records
(dispatch sheets,
consignment notes, and lab
receipts) are retained in the
company’s QAQC files.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
• No audits or reviews have been
completed on the sampling techniques
and data.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• The tenement, EL9449, covering
the Pilot Project Area is 100% owned
by Right Resources Pty Ltd in New
South Wales, Australia.
• The Pilot Project Area lies wholly
in the Maragle State
Forest operated by NSW forestry.
• Historical hard rock mining has
occurred within the Pilot Project Area
at the Historic Pilot Reef Mine
• Historical alluvial mining has been
extensively mined in the creeks
neighbouring Historic Pilot Reef
Mine within the Pilot Project Area.
Exploration done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
• Historic mining work occurred
between 1855 and 1954 across the
Tumbarumba Gold Fields.
• The historic Pilot Reef Mine was
worked in the 1880’s.
• The Company has obtained hardcopy
reports and maps in relation to this
information as part of its historical
review in preparation for their current
work program.
9 www.rightresources.com.au
Criteria JORC Code explanation Commentary
• The historic data comprises mine
production records from the NSW
Mine Registrar
• Several companies have undertaken
periodic and localised exploration
across parts of EL9449 between 1969
and 2022, primarily targeting tin and
gold mineralisation. Historical work
included geological mapping, stream
sediment sampling, limited
geochemical surveys, and trenching.
Key exploration activities include:
• A.O.G. Minerals Pty Ltd held historic
tenure EL200, which partially overlaps
EL9449; however, a review of
historical reports indicates no
exploration was conducted within the
EL9449 boundary.
• Southern Cross Exploration N.L. (JV
with Hallmark Minerals N.L.)
conducted exploration on the historic
licence EL669, which overlaps
EL9449. Two exploration stages were
completed. The first exploration
program consisted of geological
mapping, an incomplete geochemical
survey and panning for tin and gold on
a limited scale. No analysis of
pathfinder elements was carried out,
but it was reported on the limited
analysis for silver, that silver content is
proportional to gold. The second
exploration program consisted of
costeans dug to test the alluvial flats
along Back Creek between the
tributaries of Pennyweight and Mc
Geochs, totalling 21 costeans over a
length of 2.6km (N-S). Gold values
were negligible while grades of tin
were very low to be economically
exploited.
• Cluff Minerals (Australia) Pty Ltd
explored on the historic licence
EL1618, which lies within EL9449,
undertaking reconnaissance mapping,
gamma spectrometry, and stream
sediment sampling in the headwaters
of Back, Pound, McGeochs, Free
Damper, Pinchgut, Maragle, Reedy
and Pennyweight Creeks, and alluvial
flats near the junction of the Tooma
River and Pound Creek. Tin was
found to be widely distributed, but
concentrations were deemed
subeconomic. They determined tin
seems widely distributed within
granitoids and probable in stringer
mineralisation in roof pendants and
contacts.
• Southern Cross Exploration N.L. (JV
with Gulf Resources N.L.) held
tenures overlapping EL9449 (historic
licence EL1750), but no exploration
appears to have been conducted
within the EL9449 boundary.
• Bullseye Gold Pty Ltd held the historic
licence EL9056, partly covering
EL9449, but conducted no fieldwork
10 www.rightresources.com.au
Criteria JORC Code explanation Commentary
before relinquishing the licence in
2022.
Geology • Deposit type, geological setting and style
of mineralisation.
• Test The nature of the potential style
of mineralisation is quartz stockwork
within granite and porphyritic rhyolite
(based on petrology analysis
completed by the Company).
• The historic mineralised corridor
strikes 006 degrees and dips -82
degrees towards the west.
• It has been interpreted that internal
north-east (40 degrees) trending high-
grade mineralisation may occur within
the mineralisation corridor following
surface field observations of historic
stope orientations along the N-S
mineralised corridor
• The broader mineralisation system is
interpreted to be an Au porphyry
system, with the Historic Pilot Reef
Mine reflecting the fractured carapace
and veining above the main
mineralised system.
Drill hole Information • A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• The drill location was marked up using
a contract surveyor insert company
name with the final hole position to be
picked up by the same company at
the completion of the program.
• All drill information is included in
Appendix 2 Table 1.
Data aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are
usually Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Assay results pending at time of
announcement.
Relationship between
mineralisation widths
and intercept lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• Hole drilled perpendicular to the
interpreted strike of mineralisation at
approximately 006 degrees.
Mineralisation is interpreted to dip
steeply west at approximately 80-90
degrees
11 www.rightresources.com.au
Criteria JORC Code explanation Commentary
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
• No downhole grade intervals have
been reported as assay results
pending at time of announcement.
Diagrams • Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• Plans and diagrams are included in
the announcement.
• The data has been presented using
appropriate scales
• Geological and mineralisation
interpretations are based on current
knowledge and will change with
further exploration.
Balanced reporting • Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• This announcement adequately
summarises work completed
Other substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• No other material data has been
collected
Further work • The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
• Additional drilling is planned to further
test the mineralisation along strike and
down dip.
12 www.rightresources.com.au
Appendix 2 - Diamond Drillhole Collar Locations
Table 1 Diamond Drillhole Collar Locations
Hole ID Easting (m) Northing
(m)
RL (m) Zone Grid From
(m)
To (m) Comment
RRPT0001 617161 6033878 1280 MGA94 55 0 459.4 Parent Hole (depth to
459.4m at time of
announcement). Final
Depth anticipated to be
550m.
Share your feedback