Quarterly Activities & Cashflow Reports - 30 June 2026
Released
Released
Announcement PDF
Right Resources Limited
ABN 81 649 632 744 www.rightresources.com.au
41-47 Colin Street
West Perth WA 6005
ASX Announcement
+61 8 6245 2050
ASX:RRE
30 July 2026
Quarterly Activities Report
For the period ended 30 June 2026
Highlights
• Preliminary independent analysis by CODES (University of Tasmania), a globally recognised expert
in large-scale ore deposit systems, supports the presence of a Reduced Intrusion-Related Gold
System (RIRGS), reinforcing the emergence of a potentially significant new metallogenic province
within Australia1
.
• The Company’s work indicates that both gold-dominant (Pilot project) and tungsten-dominant (Blue
prospect) RIRGS-style mineralisation occurs in this emerging province, with geological characteristics
comparable to globally recognised RIRGS districts.
• Interpretation of the RIRGS model supports the identification of the Blue tungsten prospect (Blue),
where a post-period-end bulk surface sample returned a composite metallurgical head grade of 0.48%
WO3
2
.
• Blue hosts high-grade rock-chip samples up to 4.3% WO3
3
, coincident with a large-scale 4.7km x
3.4km tungsten soil anomaly4
that remains open in all directions. Scout drilling is scheduled to
commence in the current quarter to assist in defining potential mineralisation corridors.
• At the Pilot gold project (Pilot), maiden drill holes RRPT0001 and RRPT0004 were re-assayed using
the large-mass PhotonAssay method, refining and in part upgrading previously reported Fire Assay
gold results5
.
• Re-assay of RRPT0001 returned revised results including6
:
o 16m @ 0.35 g/t Au from 348m (+69% increase vs Fire Assay)
o 7m @ 0.48 g/t Au from 373m (+33% increase vs Fire Assay)
• Current work is focused on refining the RIRGS metal zonation and structural framework at Pilot, with
the interpreted proximal Au–Bi–Te–W core remaining untested and representing a priority exploration
target.
• Cash balance of A$3.24M at 30 June 2026, further strengthened by a post-period-end Placement with
firm commitments to raise approximately A$2.7 million7
.
• Funding further supported by access to a A$755,000 non-dilutive R&D Tax Incentive loan facility for
FY2026, in addition to the A$930,000 facility established in March 20268
.
Right Resources Limited (ASX: RRE) (Right Resources or the Company) is pleased to provide its activities
report for the quarter ended 30 June 2026, during which the Company advanced exploration across its
Tumbarumba assets in New South Wales, with ongoing work further validating its Reduced Intrusion-Related
Gold System (RIRGS) model and reinforcing the potential for a significant new metallogenic province.
1
ASX announcement 26 May 2026 “Independent Analysis Supports RIRGS Interpretation at Pilot”
2
ASX announcement 17 July 2026 “Blue Metallurgical Sample Returns 0.48% WO3 Head Grade”
3
ASX announcement 21 May 2026 “High-Grade Tungsten Mineralisation Identified at Blue”
4
ASX announcement 15 June 2026 “Blue Tungsten Prospect Expands to 4.7km x 3.4km”
5
ASX announcement 4 June 2026 “Results Indicate Transitional RIRGS Halo Position”
6
ASX announcement 18 June 2026 “PhotonAssay Refines Gold Distribution at Pilot”
7
ASX announcement 9 July 2026 “Major Shareholders Support Successful $2.7M Placement”
8
ASX announcement 29 June 2026 “Second R&D Funding Tranche Secured”
2 www.rightresources.com.au
Independent work by CODES (University of Tasmania) provided further independent support for the
Company's RIRGS interpretation, supporting exploration targeting at the Pilot Gold Project and identifying new
regional opportunities, including the Blue tungsten prospect, across the broader Tumbarumba portfolio.
Commenting on the activities completed in the quarter, Managing Director Graham Howard said:
“Since listing on the ASX in October last year, we have delivered upgraded maiden gold results from our first
drill holes at Pilot in an area never previously drilled and, through our collaboration with CODES, identified a
major RIRGS gold system at Pilot. These advances demonstrate that we are now targeting an opportunity
significantly larger than originally envisaged, with multi-commodity potential.
As a result of this work, Right Resources is now in a much stronger position. Research conducted with the
highly regarded Centre for Ore Deposit and Earth Sciences at the University of Tasmania has identified an
emerging new metallogenic province which contains multiple different RIRGS styles of mineralisation.
Using this RIRGS model has already paid dividends, as evidenced by the exceptional discoveries made at
Blue where high-grade tungsten has been encountered in rock samples coincident with a large soil anomaly.
Follow-up metallurgy bulk surface sampling confirms material 0.48% WO3 in an area with no previous
exploration history.
Following the end of the period, it was very pleasing to see our major shareholders back our strategy of
delivering further RIRGS-led discoveries through commitments to raise ~A$2.7 million. The support
demonstrates our shareholders understand both the significance of the recent technical milestones and the
potential scale of the opportunity.
This funding means we are poised to deliver maiden drilling at Blue and the first drill campaign at Pilot based
on a fundamentally different RIRGS interpretation. These are exciting developments and I encourage all
shareholders to keep following as we unlock the right region at the right time.”
RIRGS
Following receipt of gold assay results from Pilot in the previous quarter, Right Resources received
independent analysis from CODES (Centre for Ore Deposit and Earth Sciences, University of Tasmania),
which indicated that Pilot is prospective for a RIRGS1
.
CODES noted that its ongoing work is “advancing understanding of the hydrothermal history behind newly
discovered Au and associated Cu systems across the Tumbarumba district in NSW; one of Australia’s most
promising emerging mineral provinces” (CODES Newsletter, March 2026), providing independent support for
the Company’s evolving geological interpretation of the district.
This interpretation is supported by multiple lines of evidence, including reduced granitoid host rocks, sheeted
quartz–tourmaline±pyrrhotite+arsenopyrite veining, geochemical signatures, zircon fertility, and low-salinity
CO2-bearing fluid inclusion analysis. These features are characteristic of intrusion-related gold systems and
provide a framework for interpreting mineralisation at Pilot and across the broader district.
RIRGS are typically large-scale, structurally controlled mineral systems and are often clustered within broader
provinces. The Tintina Gold Province (Alaska–Yukon) (Figure 1) provides a global analogue, where
mineralisation is controlled between major litho-crustal faults (Tintina and Denali Faults). A broadly analogous
structural framework is interpreted in the Tumbarumba district, where mineralisation is influenced by the litho-
crustal Gilmore Fault, which transects the Company’s eastern tenements.
Work completed with CODES indicates early-stage prospectivity for multiple intrusion-related systems across
the district.
3 www.rightresources.com.au
Figure 1: Worldwide distribution of RIRGS, including Tintina Gold Province
Blue Tungsten Prospect (Blue)
Interpretation of the RIRGS model enhances the potential for a new metallogenic province and has also
supported regional targeting at other key targets within Right Resources’ Tumbarumba assets.
An example of the model can be seen at Blue, located on EL9028. The model predicts a characteristic metal
zonation pattern for this style of system, with tungsten and bismuth expected in a proximal position of an
intrusion-related hydrothermal system, consistent with the geochemical signature observed at Blue.
From May through to June, Right Resources announced results from an initial soil sampling programme based
upon ~200 m spacing, geological mapping, and rock chip sampling3
.
The work has identified a broad tungsten soil anomaly surrounded by a molybdenum soil anomaly which is
now 4.7km x 3.4km in size (Figure 2)4
. Rock chip samples within this soil anomaly, assayed by a certified
laboratory, have returned tungsten grades up to 3.4% W (4.3% WO3) from outcrop (Figure 3)3
.
Post period-end, the Company announced that a ~32 kg surface bulk sample containing visible scheelite
mineralisation had been received by Nagrom Laboratories in Perth for maiden metallurgical testwork2
. This
sample returned a composite head grade of 0.48% WO3 and will be used to establish initial metallurgical
recovery parameters during Q3 2026. This result establishes the feed grade for the Company’s initial
metallurgical testwork program and provides the basis for assessing the response of the tungsten
mineralisation to beneficiation and recovery processes.
The current testwork program is focused on determining whether the tungsten-bearing minerals can be
effectively upgraded from the composite feed and, if so, the achievable concentrate grade and tungsten
recovery.
Rock chip results are selective samples of outcrop and subcrop and are not necessarily representative of
average mineralisation across the broader prospect area. They confirm the presence of high-grade tungsten
mineralisation within the defined anomaly and justify systematic follow-up work.
4 www.rightresources.com.au
Figure 2: (Left) Blue Prospect sampling location map showing EL9028 and EL9889 covering the interpreted western extension
of the tungsten-bismuth-molybdenum anomaly, Tumbarumba district, NSW. (Right) Tungsten (W) pXRF soil anomaly at Blue
Prospect (4.7km x 3.4km). High-grade certified rock chip results occur within the defined anomaly.
Figure 3: Tungsten (W) high-grade certified rock chip results occur within the defined anomaly.
5 www.rightresources.com.au
Additionally, geological mapping at Blue defined a well-developed sheeted vein system comprising quartz-
dominant and locally brecciated veins hosted within a sheared and altered intrusive sequence. Individual veins
were typically up to 0.4 m thick, forming sheeted vein arrays of 20 m to greater than 70 m width across the
prospect (Figure 4).
Multiple tungsten mineral species were identified at Blue, supporting a primary, hydrothermal origin for the
tungsten mineralisation:
• Scheelite (CaWO₄) - the primary ore mineral of tungsten, confirmed by UV fluorescence observations
and supported by pXRF analysis (Figure 5)
• Wolframite ((Fe,Mn)WO₄) - an important primary tungsten ore mineral
• Tungstite (WO₃.H₂O), meymacite (WO₃.2H₂O) and stolzite (PbWO₄) - interpreted secondary tungsten
Figure 4: Road cutting at the Blue Prospect showing extensive tungsten veining exposed over approximately 100 metres.
Figure 5: Scheelite under short-wave UV light showing characteristic bright blue fluorescence -
independently verified by CODES researchers, February 2026.
Results continue to indicate that the system remains open. Multiple vein zones have been mapped and
documented within the anomalous footprint, and representative outcrop samples have been submitted for
multi-element assay analysis. The anomaly is interpreted to extend westward onto EL9889
(granted April 2026). Additional soil and outcrop sampling is ongoing to define the full extent of the system.
Results to date justify further exploration activities at Blue and a maiden ~3,000m AC/RC drilling program is
anticipated to commence in Q3 2026.
6 www.rightresources.com.au
Pilot Gold Project (Pilot)
Following interpretation of Pilot as a RIRGS, the Company reviewed results from maiden drill holes RRPT0001
and RRPT0004, which are interpreted to represent the transitional halo of the system5
. The proximal high-
grade Au–Bi–Te–W core remains untested (Figure 6).
Figure 6: RIRGS metal zonation model for Pilot, showing conceptual Au-Bi-Te-W proximal to the
intrusive centre grading to Ag-Pb-Zn at distal margins.
In RIRGS, gold can be coarsely and heterogeneously distributed and is poorly represented by an industry
standard sample preparation and 50g fire assay (FA) charge, prompting evaluation of different sample
preparation and assay methodology.
PhotonAssay (PA) uses a 300-500g crushed sample, is non-destructive, and is suited to detecting nugget-
style gold. Where PA returns higher grades than FA on the same material, this is consistent with
heterogeneous distribution.
At hole RRPT0004, all PA results passed QAQC and further testwork using either FA to extinction or Screen
Fire Assay (SFA) is underway to assess lower detection limits. PA results at or near detection limits are
considered preliminary.
Table 1: RRPT0004 Fire Assay and PhotonAssay results and comparison (all results preliminary).
From
(m)
To (m) Width
(m)
FA (g/t Au) PA (g/t Au) Variance Notes
342.3 346 3.7 0.49 0.46 -7% Higher-grade sub-interval. Above
PA detection limit
342.75 343.25 0.5 2.18 2.24 +3% Maximum FA grade - re-assayed by
PA
353.7 356.7 3.0 0.06 0.11 +84% FA and PA confirm variability
362.6 365 2.4 0.20 0.20 — Sub-interval within vein zone
All intervals are reported as downhole lengths; true widths are not known. PA results are preliminary pending either FA to extinction or
SFA. Minor discrepancies in variances may arise due to rounding and reporting precision.
7 www.rightresources.com.au
At hole RRPT0001 which is 699.4m east beneath historic Pilot workings previously reported: 42m @ 0.2 g/t
Au from 338m (FA, ASX: 5 February 2026). Following re-analysis using PA methodology, the Company
identified6
:
• PhotonAssay, utilising a 300g sample (six times larger mass than Fire Assay), has refined the gold
distribution between 338m to 380m in RRPT0001.
• Variability testwork confirms the presence of coarse gold particles, supporting earlier observations that
the Pilot RIRGS exhibits a high nugget gold distribution.
• Final PA results for RRPT0001 between 338m to 380m include:
o 2m @ 0.37 g/t Au from 338m (previously 0.68 g/t Au FA, -45% reduction)
o 16m @ 0.35 g/t Au from 348m (previously 0.21 g/t Au FA, +69% increase)
o 7m @ 0.48 g/t Au from 373m (previously 0.36 g/t Au FA, +33% increase)
These results provide an improved representation of gold distribution within the system, particularly in zones
where coarse gold is present.
The Company is progressing evaluation of metal zonation of the Pilot RIRGS, and has advanced age dating,
fluid inclusion and petrology analysis during the quarter. The Company also completed ground magnetic
surveys to the south and east of Pilot in order to refine the structural framework as part of target definition of
gold mineralisation. This included evaluation of down hole acoustic televiewer logging to accurately define
both fault structures and sheeted vein zones.
The Company advanced assay methodology testwork and has defined new vectors that provide visual guides
of potential mineralised zones. This work includes identification of five vein types associated with different
phases of gold mineralisation as part of the CODES analysis.
Next Steps
Building on the technical and geological advances achieved during the June quarter, Right Resources will
continue progressing multiple exploration and technical work programs designed to refine exploration targeting
and unlock further value across its Tumbarumba portfolio.
Pilot Gold Project
• Process recent ground magnetic data completed to resolve structural framework, advance age dating
and metal zonation evaluation of drill core and surface mapping data to further refine the updated
RIRGS geological interpretation with CODES.
• Reprocess additional drill core and complete ongoing assay validation, including further work on FA
and/or SFA methodology.
• Expand surface mapping and geochemistry program informed by advances in structural framework
evaluation
• Subject to results, commence a follow-up drilling program targeting elevated gold mineralisation.
• Continue refining the RIRGS geological model to support future exploration and expand geophysical
and geochemistry knowledge of Shadow, Toucan, Rose and Sonic prospects (east of Pilot).
Blue Tungsten Project
• Continue to expand the W+Mo+Bi anomaly as well as define elevated tungsten mineralisation zones
for follow up scout drilling.
• Advance approvals to enable future drilling.
• Complete maiden metallurgical testwork.
• Commence the planned ~3,000m AC/RC drilling program.
• Continue structural interpretation to refine drill targeting.
• Assess the broader tungsten, bismuth, molybdenum and gold potential across the project.
8 www.rightresources.com.au
New England
• Continue regional geological interpretation and target generation.
• Advance evaluation of district-scale gold-copper opportunities across the portfolio.
Portfolio
• Continue progressing project approvals.
• Advance regional geological interpretation across the Tumbarumba portfolio.
• Evaluate additional RIRGS targets generated through the evolving geological model.
• Prioritise exploration activities capable of delivering the greatest technical and commercial value.
Collectively, these work programs are designed to further refine the Company's geological understanding,
prioritise future drill targets and continue systematically unlocking the broader discovery potential across the
Tumbarumba metallogenic province.
Corporate
Strategic Critical Minerals
The scale of the Pilot system and emerging regional-scale exploration framework, together with the Blue
tungsten discovery, have supported the commencement of strategic partnership and funding discussions.
Work continues on the restructuring of these assets into dedicated subsidiary entities.
Tungsten is classified as a critical mineral by both the Australian Government and the United States
Department of the Interior, with applications across defence, advanced manufacturing, mining equipment,
renewable energy technologies and electronics. China currently accounts for a significant proportion of global
tungsten supply, highlighting the strategic importance of diversifying supply sources.
R&D Tax Incentive
During the quarter, the Company secured an approved facility of A$755,000 with Rockford RDF Pty Ltd
(Rockford) to provide funding for R&D activities undertaken during the period February to April 2026
(inclusive)7
.
Following an evaluation of the Company’s ongoing R&D activities with Deloitte, this facility represents the
second tranche of R&D funding secured for FY2026. This follows an initial facility of A$930,000 covering the
period July 2025 to January 2026 (refer ASX announcement 31 March 2026), bringing the total R&D funding
secured for FY2026 to A$1,685,000.
This facility essentially advances funds to the Company that are otherwise expected to be received when its
R&DTI refund is paid, providing early access to non-dilutive capital based on eligible R&D expenditure incurred
and the forecast R&DTI refund expected to be received for FY2026. Full repayment of the facility is expected
to be made by the Company upon receipt of its R&DTI refund, anticipated in H2 CY 2026. This funding
approach was successfully utilised in FY2025.
Finance
At quarter end, the Company held A$3.24 million in cash. The Company’s unaudited quarterly cash flow report
is disclosed in the attached Appendix 5B.
The Company’s financial position was strongly supported post period-end via firm commitments to raise
approximately A$2.7 million (before costs) through a Placement7
.
The Placement was supported by major existing shareholders, reflecting their continued confidence in the
exploration opportunity across the Company’s highly prospective Tumbarumba and New England portfolios.
The Placement was priced at A$0.09 per new share, representing a ~6% discount to the Company's last
closing price of A$0.096 on 6 July 2026 and a ~5.0% discount to the 5-day VWAP of A$0.095.
9 www.rightresources.com.au
Participants will receive one (1) free unlisted attaching option for every two (2) new shares subscribed,
exercisable at A$0.09 and expiring 24 months from the date of issue.
The Company also intends to undertake a Securities Purchase Plan (SPP) following completion of the
Placement, providing eligible shareholders with the opportunity to participate on equivalent terms to the
Placement, including attaching options. The Company may seek to raise up to approximately A$1.0 million
under the SPP. Further details regarding the SPP will be announced following completion of the Placement.
Proceeds from the Placement will enable the Company to advance high-priority drilling programs at Pilot and
Blue, accelerate value-generating exploration activities and maintain momentum following recent technical
breakthroughs.
ENDS
This announcement has been approved for release by the Board of Right Resources Limited.
Further Information
Graham Howard
Managing Director
E: info@rightresources.com.au
Jessamyn Lyons
Company Secretary
E: jessamyn.lyons@rightresources.com.au
Media
David Tasker
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
Follow Us
About Right Resources (ASX: RRE)
Right Resources Limited is a New South Wales-based mineral exploration company focused on advancing a
portfolio of gold, copper and critical mineral assets across 2,459 km² of tenements in the Tumbarumba and
New England regions, both located within historically significant goldfields and mineral provinces.
The Company's flagship asset is the Pilot Project, a high-grade gold target in the Tumbarumba Region with a
history of high-grade underground gold production (~38 g/t Au), which is being advanced through a maiden
diamond drilling programme in collaboration with CODES (Centre for Ore Deposit and Earth Sciences,
University of Tasmania). The Blue Prospect tungsten discovery adds a significant critical minerals dimension
to the Company's portfolio.
Forward looking statements
This announcement may contain forward-looking statements, including statements regarding the Company's
plans, strategies, objectives and expectations for future project-level, strategic, partnership and funding
opportunities. Forward-looking statements are based on the Company's current expectations and assumptions
and involve known and unknown risks, uncertainties and other factors, many of which are beyond the
Company's control. Actual results, performance or achievements may differ materially from those expressed
or implied by such statements. The Company does not undertake any obligation to update forward-looking
statements, except as required by law.
Previously Reported Exploration Results
The information in this announcement that relates to the Company’s Exploration Results has been extracted
from the Company’s previous ASX announcements dated 4, 15 and 18 June 2026 and 21 and 26 May 2026.
The Company confirms that it is unaware of any new information or data that materially affects the information
included in those announcements. To the extent disclosed above, the Company confirms that the form and
10 www.rightresources.com.au
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcements. All previously released announcements referred to within this announcement
can be found on the Company’s website at www.rightresources.com.au.
ASX Additional Information
Finance
The Company provides the following information pursuant to ASX Listing Rule requirements:
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the quarter totalled
$2.20M. Details of exploration activities undertaken during the quarter are as prescribed in this Quarterly
Activities Report.
ASX Listing Rule 5.3.2: The Company confirms there were no mining and production activities undertaken
during the quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements and the Company’s beneficial percentage interest
held in those tenements at the end of the quarter is included in the Table at the end of this Appendix.
ASX Listing Rule 5.3.5: Payments to related parties or associates of the Company during the quarter as set
out in section 6.1 of the attached Appendix 5B totalling $236k relate to executive salaries, director fees,
superannuation and consulting fees.
ASX Listing Rule 5.3.4: In the next section the Company provides its actual expenditure on the individual items
in the two year “use of funds” statement in its IPO Prospectus since the date of its admission to ASX’s Official
List (being 27 October 2025) against the estimated expenditure on those items and an explanation of any
materials differences.
Use of Funds
Use of Funds
Prospectus Estimate
($10M Subscription)
Actual Use
to 30 June 2026
Variance
$ millions
Exploration Expenditure 6.91 7.17 (0.26)
Costs of Offer 1.15 0.60 0.55
Working Capital & Other Corporate 3.25 1.76 1.49
Total 11.30 9.53 1.78
Notes to Use of Funds
• Expenditure for the Period 27 October 2025 (Listing Date) to 30 June 2026.
• Exploration Expenditure is primarily for the Pilot drilling program and includes remaining establishment
expenditure, direct labour, contractor costs, supervision and support services for the Pilot drilling
program, including an allocation of direct corporate support costs.
• The remainder of Costs of the Offer were funded from existing cash reserves prior to the listing date.
• Table is prepared on an accrual basis and includes amounts that have been recognised for the Quarter
for which payments have not yet been made.
• The Company has secured R&DTI loans from Rockford Equity ($930,000 in March 2026 and $755,000
in June 2026)
• Figures may be affected by rounding.
The Company is currently on schedule to meet the business objectives underpinning the use of funds table
in the Prospectus.
11 www.rightresources.com.au
Tenement Summary
Tenement Location Nature of Interest
Interest at
beginning of
Quarter
Interest at end of
Quarter
EL9028 New South Wales 100% 100% 100%
EL9029 New South Wales 100% 100% 100%
EL9089 New South Wales 100% 100% 100%
EL9449 New South Wales 100% 100% 100%
EL9712 New South Wales 100% 100% 100%
EL9770 New South Wales 100% 100% 100%
EL9170 New South Wales 100% 100% 100%
EL9142 New South Wales 100% 100% 100%
EL9889 New South Wales 100% 0%^
100%
EL9922 New South Wales 100% 0%^
100%
^
Application Pending as at 1 April 2026
Tenement Map
12 www.rightresources.com.au
Appendix 5B: Quarterly Cashflow Report
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Name of entity
Right Resources Limited
ABN Quarter ended (“current quarter”)
81 649 632 744 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for - -
(a) exploration & evaluation - -
(b) development - -
(c) production - -
(d) staff costs (550) (2,209)
(e) administration and corporate costs (182) (1,958)
1.3 Dividends received (see note 3) - -
1.4 Interest received
11 31
1.5 Interest and other costs of finance paid - -
1.6 Income taxes received - 874
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities (721) (3,262)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment (83) (1,087)
(d) exploration & evaluation (2,196) (5,411)
(e) investments - -
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
(a) entities - -
(b) tenements - -
13 www.rightresources.com.au
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities (2,280) (6,498)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities) - 11,671
3.2 Proceeds from issue of convertible debt
securities - -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities - (727)
3.5 Proceeds from borrowings 755 2,298
3.6 Repayment of borrowings (1) (682)
3.7 Transaction costs related to loans and
borrowings - (1)
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities 754 12,559
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period 5,488 443
4.2 Net cash from / (used in) operating activities
(item 1.9 above) (721) (3,262)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) (2,280) (6,498)
4.4 Net cash from / (used in) financing activities
(item 3.10 above) 754 12,559
4.5 Effect of movement in exchange rates on
cash held - -
4.6 Cash and cash equivalents at end of
period 3,241 3,241
14 www.rightresources.com.au
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 3,241 5,488
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above) - -
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1 236
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an under
Share your feedback
Discover